Mobile lifting equipment meter and valve replacement - The PortaGantry Rapide
Contractor Morgan Sindall turned to the PORTAGANTRY RAPIDE to decommission an old water treatment plant in Llanelli, South Wales for client, Welsh Water.
The dual-functional PORTAGANTRY Rapide was the ideal solution for utility supplier Stadtweke Elmshorn. They required fall protection for at least 2 workers who need to enter shafts via fixed ladders while also needing to lift and carefully replace 400kg pumps.
Standard Steel required their workers to complete routine cleaning and maintenance by safely accessing heavy forging press machines from underneath the system. The REID TDAVIT was the ideal solution to keep their workers safe whilst carrying out the task because of it’s quick and easy assembly alongside its usefulness as a secondary means of access and retrieval.
D&G Noble, a haulage firm based in Bedford, successfully used the PORTAGANTRY system recommended by Kranserv to install new control panels in two older locations with limited accessibility for a clean water facility near London.
The Natural History Museum sought Ritelift's assistance in installing replica bones for their latest exhibit, which features the Patagotitan Mayorum, the largest animal ever to walk the earth. They used the PORTAGANTRY to help position the colossal creature skeleton.
Transport Repairs Ltd needed a new lifting solution to replace their current time-consuming, dangerous, and difficult lifting method. Fortunately they came across our Porta Gantry.